&nbp;

Actemium Bahrain

 

Bapco

Replacement of steam turbo generator ( STG1)

Client: Technip/Ramsis

End User: Bapco

Project Location: Bapco Refinery

Overall schedule: August 2011 to October 2014

Type of contract: Re-measurable

Construction and installation of two new Steam Turbo Generators (each 14 MW, 11.5 kV, 60 Hz) including the ancillaries systems, buildings, electrical distribution and integration to DCS control.  The work consists of installation, pre-commissioning, commissioning / start up assistance for transformers. MV/LV panels ,UPS , MV/LV /control/instrument/FO cabling, cable tray, ladders, conduits, control stations, JBs, heat tracing, cathodic protection, DCS/ESD systems, gas /smoke detections, local panels, field instruments, analysers, telecommunication equipment, calibration test, loop check and functional tests, earthing & lighting protection, demolition work.

&nbp;